TOLEDO, Ohio — Construction on the bridge carrying Secor Road over the Ottawa River has been completed. The bridge reopened Wednesday.
The project, which was completed in collaboration with the city of Toledo and the village of Ottawa Hills, began on Jan. 3, 2023. During construction, the bridge was completely replaced. New sidewalks and approach pavement were also installed.
A picture of the completed bridge is included below:
MORE LOCAL HEADLINES FROM WTOL 11